On November 24, BJ ENERGY INTL’s 0.11 MW distributed solar PV project in Chaoyang District, Beijing, successfully completed the project filing process, marking another achievement in the company’s renewable energy development and bringing new momentum to the adoption of clean energy in public institutions.

Located on the rooftop of the Duty-Related Crime Investigation and Supervision Building of the Third Branch of Beijing Municipal People’s Procuratorate in Chaoyang District, the project utilizes approximately 648 square meters of rooftop space to install a distributed solar PV power generation system, with a total installed capacity of 0.11 MW. The project adopts a “self-consumption with surplus electricity fed into the grid” model. Upon commissioning, it is expected to generate approximately 120,000 kWh of electricity annually, saving approximately 35 tons of standard coal equivalent and reducing carbon dioxide emissions by approximately 69 tons per year, while effectively lowering the building’s electricity consumption costs. The successful filing and advancement of the project align with Beijing’s development priorities, reinforce the security of the capital’s green power supply, and support the city’s carbon peaking and carbon neutrality goals, injecting green momentum into Beijing’s energy mix optimization and low-carbon transition.