• 26
    06,2026
    On June 25, Huang Hui, Vice President and Chief Financial Officer of Beijing Energy International, met in Chengdu with Tang Hua, Chairman of Ganzi Energy Development Group (GEDG), Peng Jianjun, General Manager, and their delegation. The two sides exchanged views on deepening cooperation in the clean energy sector in Ganzi Tibet...
  • 26
    06,2026
    On June 25, Huang Hui, Vice President and Chief Financial Officer of Beijing Energy International, met in Chengdu with Dai Jianyong, Member of the Party Committee and Vice President of China Construction Bank Sichuan Branch, and his delegation. The two sides exchanged views on strengthening bank-enterprise cooperation and enhancing ...
  • 25
    06,2026
    On June 24, six wind power projects of Beijing Energy International in Bijie, Guizhou Province received official approval. These include the 90 MW Muban Wind Power Project in Zhijin County, the 90 MW Xiaoniuchang Wind Power Project in Zhijin County, the 100 MW Nuochong Wind Power Project in Zhijin County, the 100 MW Baini ...
  • 18
    06,2026
    On 18 June 2026, Beijing Energy International successfully held its 2026 Annual General Meeting (AGM) in Hong Kong. Zhang Ping, Executive Director and President, Huang Hui, Chief Financial Officer, and Vice President Wu Chaoke and Vice President Jin Xin attended the meeting in person, while the remaining Directors, shareholder...
  • 07
    06,2026
    On June 5, Liu Guoxi, Secretary of the Party Committee and Chairman of the Labor Union of Beijing Energy International, led a delegation to Wanyuan, Dazhou City, Sichuan Province, where he met with Jiang Bo, Secretary of the Wanyuan Municipal Party Committee. The two sides held in-depth discussions on project implementation support,...
  • 05
    06,2026
    On June 4, Zhang Ping, Executive Director and President of Beijing Energy International, led a delegation to Shanghai and held talks with Ma Jun, Deputy Secretary of the Party Committee and General Manager of CCCC Third Harbor Engineering Co., Ltd. (“CCCC Third Harbor Engineering”), to discuss further cooperation on new e...
  • 27
    05,2026
    On May 27, Zhang Ping, Executive Director and President of Beijing Energy International, met in Beijing with Zhang Jianjun, Party Secretary and Executive Director of China National Coal Industry Import & Export Group (Tianjin) Co., Ltd., and his delegation. The two sides held in-depth discussions on advancing co...
  • 27
    05,2026
    On May 26, Zhang Ping, Executive Director and President of Beijing Energy International, met in Beijing with Zhang Xi, Party Secretary and Chairman of PowerChina Chongqing Engineering Corporation Ltd., and his entourage. The two sides held extensive and in-depth discussions on advancing cooperation in the clean energy sector. ...
  • 22
    05,2026
    On May 22, Zhang Ping, Executive Director and President of Beijing Energy International, met in Beijing with Wu Jianxue, Party Secretary and Chairman of PowerChina Guiyang Engineering Corporation. The two sides held discussions on deepening cooperation in areas including clean energy and the development of “Green Power to Beijing” ...
  • 22
    05,2026
    On May 22, Wu Chaoke, Vice President of Beijing Energy International, met in Beijing with Chen Junhua, Vice President of Guangdong Electric Power Development Co., Ltd., and his delegation. The two sides held in-depth discussions on deepening cooperation in the new energy sector.  During the meeting, both parties gave detailed prese...